No. |
CLIENTS |
LOCATION |
PROJECT DESCRIPTION |
13. |
|
- • Kasemen Serang - Banten
|
- • Repair Check Valve (Spring Replacement)
- • Leakage Test
- • Fabrication, Spring Replacement and Gasket Check Valve Double Door 350mm.
|
12. |
|
- • Bojonegara Serang - Banten
|
- • Purification of Oil Transformer and Switch Gear Service of Medium Voltage Maintenance.
- • Testing
|
11. |
|
|
- • FIRE ALARM SYSTEM FOR PLANT B AND DEPO B.
- • Engineering
- • Material Supply
- • Installation
- • Programming
- • Commissioning
|
10. |
- PT. Mandiri Reka Abadi for Goodyear
|
|
- • Service of Control Jockey Pump and Transducer.
- • Material Supply
- • Installation
- • Setting
|
9. |
- PT. Mandiri Reka Abadi for Goodyear
|
|
- • Installation MCCB and Power Line Vacuum Pump 2 x 25kW.
- • Material Supply
- • Installation
- • Programming
- • Commissioning
|
8. |
- PT. Hutama Karya (HMP-Joint Operation)
-
|
- • Muara Karang TJB – Indonesia
|
- • Installation of Foundation and Pig Launcher – Line Gas Pipe Support
- • Clearance Area
- • Fabrication
- • Concreting
- • Testing of Mechanical and Concrete
- • Install Pipe Support.
- • Install Harmony Wall
- • Commissioning.
|
7. |
- PT. Hutama Karya (HMP-Joint Operation)
|
- • Muara Karang TJB – Indonesia
|
- • Install Pipe PVC Diameter 16” x 300 meter x 2 Line
- • Clearance Area
- • Fabrication and Install Pipe Support.
- • Distributed and Install Pipe
- • Testing and Commissioning
- • Reporting
|
6. |
- PT. Mahendra Samudera Biru for PT. Persero TBBM Rewulu
|
|
- • Repair and Additional PH-Meter sensor for Oil Catcher
- • Material Supply
- • Installation
- • Training
|
5. |
- Dwi Cipta Usaha for M3 Energy
|
- • Indah Kiat Area Merak - Indonesia
|
- • Material Supply Carbon Steel Plate 4’x8’x12mm, 30 sheet.
- • Control of Quantity and Dimensionally
|
4. |
- PT. LINTANG TIARA CIPTA for PT. Komipo Pembangki Jawa Bali – PT.PLN
-
|
- • Tanjung Jati – Jepara – INDONESIA
|
- • Installation Additional Welding Receptacle for Unit #3 and Unit #4 Boiler
- • Pulling of cable from CCR Breaker to 6 Receptacles at level 2nd and level 6th for each Boiler Unit 3 & 4 (Total 12 Route of Cable pulling).
• Installation for 6 Receptacles at level 2nd and level 6th for each Boiler Unit 3 & 4 (Total 12 Receptacles).
• Installation & Connection for 2 Pull Box and Cable lug terminal for each Boiler Unit 3 & 4 (Total 4 Pull Boxes and Cable lug terminal completed set).
• Installation for 1” & 2” pipe conduits, Flexible conduits, Pipe conduit Elbow & theirs accessories.
• Connection for all tail end and head end of cables at Pull Boxes, Receptacle and Breakers at each Boiler Unit 3 & 4 Areas.
- • FAT for all Receptacles function (Ready to use) by checking of electrical parameters such as Current (A) and Voltage (VAC)
|
3. |
- PT. Visi Catur Mitra for PT. Metalindo Gunatama
-
|
|
- • Hydrostatic Test of Pipe A106 Grade B, Diameter 1.5 inch – Schedule 80
- • Filling industrial water
- • Hydro Pressure Testing
- • Holding Time
- • Inspection for leakage, Drop during Holding, deformation and Visually.
- • Water Drain and Flushing.
|
2. |
- PT. Lintang Tiara Cipta for PT. Tenaris SPIJ
-
|
- • Kasemen Serang – Banten
|
- • Furnace Cable Power and Control Rewiring
- • Install ducting & cable tray, Laying, Crimping & Connecting of Cable, Reprogramming/Adjusting in Test Commissioning
|
1. |
- PT. Mustika Cemerlang for PT. Pertamina
|
- • Brand Office Jogjakarta
|
- • Installation of Fire Protection System– Springler, Hydrant and Early Warning System
- • Material Supply
- • Installation
- • Programming
- • Training
|