Project Expereince

Email us Now at: info@crystall-scope.com

ENG & CONSTRUCTION EXPERIENCES

No.
CLIENTS
LOCATION
PROJECT DESCRIPTION

13.

      • PT. Sauh Batera Samudera
      • • Kasemen Serang - Banten
      • • Repair Check Valve  (Spring Replacement)
      • • Leakage Test
      • • Fabrication, Spring Replacement and Gasket Check Valve Double Door 350mm.

12.

      • PT. Polychem Lindo
      • • Bojonegara Serang - Banten
      • • Purification of Oil Transformer and Switch Gear Service of Medium Voltage Maintenance.
      • • Testing

11.

      • PT. Dover Chemical
      • • Merak Plant - Banten
      • • FIRE ALARM SYSTEM FOR PLANT B AND DEPO B.
      • • Engineering
      • • Material Supply
      • • Installation
      • • Programming
      • • Commissioning

10.

      • PT. Mandiri Reka Abadi for Goodyear
      •  
      • • Service of Control Jockey Pump and Transducer.
      • • Material Supply
      • • Installation
      • • Setting

9.

      • PT. Mandiri Reka Abadi for Goodyear
      •  
      • • Installation MCCB and Power Line Vacuum Pump 2 x 25kW.
      • • Material Supply
      • • Installation
      • • Programming
      • • Commissioning

8.

      • PT. Hutama Karya (HMP-Joint Operation) 
      •  
      • • Muara Karang TJB – Indonesia
      • • Installation of Foundation and Pig Launcher – Line Gas Pipe Support
      • • Clearance Area
      • • Fabrication
      • • Concreting
      • • Testing of Mechanical and Concrete
      • • Install Pipe Support.
      • • Install Harmony Wall
      • • Commissioning.

7.

      • PT. Hutama Karya (HMP-Joint Operation) 
      • • Muara Karang TJB – Indonesia
      • • Install Pipe PVC Diameter 16” x 300 meter x 2 Line
      • • Clearance Area
      • • Fabrication and Install Pipe Support.
      • • Distributed and Install Pipe
      • • Testing and Commissioning
      • • Reporting

6.

      • PT. Mahendra Samudera Biru for PT. Persero TBBM Rewulu
      •  
      • • Repair and Additional PH-Meter sensor for Oil Catcher
      • • Material Supply
      • • Installation
      • • Training

5.

      • Dwi Cipta Usaha for M3 Energy 
      • • Indah Kiat Area Merak - Indonesia
      • • Material Supply Carbon Steel Plate 4’x8’x12mm, 30 sheet.
      • • Control of Quantity and Dimensionally

4.

      • PT. LINTANG TIARA CIPTA for PT. Komipo Pembangki Jawa Bali – PT.PLN
      •  
      • • Tanjung Jati – Jepara – INDONESIA
      • • Installation Additional Welding Receptacle for Unit #3 and Unit #4 Boiler
      • • Pulling of cable from CCR Breaker to 6 Receptacles at level 2nd and level 6th for each Boiler Unit 3 & 4 (Total 12 Route of Cable pulling).

• Installation for 6 Receptacles at level 2nd and level 6th for each Boiler Unit 3 & 4 (Total 12 Receptacles).
• Installation & Connection for 2 Pull Box and Cable lug terminal for each Boiler Unit 3 & 4 (Total 4 Pull Boxes and Cable lug terminal completed set).
• Installation for 1” & 2” pipe conduits, Flexible conduits, Pipe conduit Elbow & theirs accessories.
• Connection for all tail end and head end of cables at Pull Boxes, Receptacle and Breakers at each Boiler Unit 3 & 4 Areas.

      • • FAT for all Receptacles function (Ready to use) by checking of electrical parameters such as Current (A) and Voltage (VAC)

3.

      • PT. Visi Catur Mitra for PT. Metalindo Gunatama
      •  
      • • Jakarta Indonesia
      • • Hydrostatic Test of Pipe A106 Grade B, Diameter 1.5 inch – Schedule 80
      • • Filling industrial water
      • • Hydro Pressure Testing
      • • Holding Time
      • • Inspection for leakage, Drop during Holding, deformation and Visually.
      • • Water Drain and Flushing.

2.

      •  PT. Lintang Tiara Cipta for PT. Tenaris SPIJ
      •  
      • • Kasemen Serang – Banten
      • • Furnace Cable Power and Control Rewiring
      • • Install ducting & cable tray, Laying, Crimping & Connecting of Cable, Reprogramming/Adjusting in Test Commissioning

1.

      • PT. Mustika Cemerlang for PT. Pertamina
      • • Brand Office Jogjakarta
      • • Installation of Fire Protection System– Springler, Hydrant and  Early Warning System
      • • Material Supply
      • • Installation
      • • Programming
      • • Training

 

-